Cables - cable schedule

Last updated on 2021-09-20 1 mins. to read

A project’s cable schedule is accessed by clicking on the 'Manage Cables' button. The schedule shows the current project at the top, which can be changed by selecting from the drop-down list.  

The cable schedule can be filtered by entering search terms in the search box and sorted by clicking on the column headers.  Clicking the add (+ ) in the action menu lets you create a new cable, and clicking on a cable field in the grid will allow you to edit the details.  Traffic light type symbols show the current status of current capacity, voltage drop and fault withstand calculations for the cable.

By clicking the select boxes to the left, you can select one or more cables.  Once selected cables can be deleted by clicking the delete (wastebasket) button.

The action menu and record menu let you work on and use your cables.

Reports are for all cables in the schedule, or by clicking 'print selected only' you can print only cables which have been selected in the schedule.

As you hove over a row the record menu (three vertical dots), is available at the right. From here you can carry out actions specific to an individual cable:

When adding or editing a cable you will be taken to the cable edit screen. 

Comments